Uploading inspection results
Send completed inspection results from the Inspection App to Tag Browser by .iwt file or QR code.
Start a transfer
Section titled “Start a transfer”Do this first in the Inspection App, then pick a transfer method below.
-
In the Equipment Browser, select the items you want to transfer — typically Select All to include every completed item, or check individual rows if you only need a subset.
-
Open the Sidebar Menu (hamburger icon, top-left) and click Transfer under Actions.
(Sidebar menu — Transfer under Actions)
(Select Upload Method dialog)
.iwt file upload
Section titled “.iwt file upload”Use this method when the inspection device does not have internet access. You create a file and transfer it manually.
-
In the Select Upload Method dialog, choose Create .iwt File.
-
Save the file — keep the default filename for traceability.
-
Transfer the
.iwtfile to a device with internet access (e.g. via USB or network share). -
In the Tag Browser, click the Inspection dropdown and choose Upload.
(Inspection dropdown — Upload)
-
Configure the upload options and leave Skip Backup unchecked — see Upload Dialog for every setting.
-
Click IWP file and select the
.iwtfile. (File selected and ready to upload)
-
Click Upload and wait until the system messages show Upload processed successfully and the status reads Done.
(Upload complete — system messages)
QR code upload
Section titled “QR code upload”Use this method when both your inspection device and a computer with Tag Browser have internet access. Results upload directly — no .iwt file needed. Start from the Select Upload Method dialog after Start a transfer.
-
In the Select Upload Method dialog, choose Upload by QR Code.
-
In the Tag Browser, click the Inspection dropdown and choose QR Upload.
(Inspection dropdown — QR Upload)
(QR Upload pairing page)
-
Scan the QR code in Tag Browser — the app pairs with the project and uploads your inspection data.
-
Watch the Status line on the QR Upload page — it changes from Waiting for upload to Upload complete when the transfer finishes.
(QR Upload — upload complete)
What happens after upload
Section titled “What happens after upload”- The Inspection Date, IWP Upload Date, and Grade columns in the equipment grid update to show the most recent inspection for each item
- Non-Conformity (N) findings create new defects automatically
- The D (Defects) column in the equipment grid reflects new findings
- The Events log (managers only) and the equipment HISTORY tab record the IWP import
Troubleshooting
Section titled “Troubleshooting”| Issue | Solution |
|---|---|
| Upload fails | Check that you are selecting an .iwt file (not .iwp). If the file is 0 KB or the upload still fails, transfer it from the device again |
| Defects not created after upload | Check that Ignore NC inspection results is set to No in the upload options |
| Equipment data not updated | Ensure Automatically update equipment list is set to Yes in the upload options |
| Can’t find uploaded results | Check the Inspection Date column in the equipment grid. For a full audit trail, open the Equipment Window and check the HISTORY tab |
Related topics
Section titled “Related topics”- Filling in the Check Sheet — Complete inspections in the Inspection App
- Merging Work Packs — Combine results from multiple inspectors before uploading
- Inspections Reference — Full description of the IWP system, upload options, and inspection history